Kitchen remodeling
Layouts, cabinets, counters, lighting and flooring — planned together before demolition starts.

In New Jersey, plumbing and electrical work must be performed by licensed trade contractors, and permit-required work does not begin until the municipality issues the permit.
CMD’s finished kitchens show full-height cabinetry, aligned backsplashes, island-centered lighting and floors that continue into adjoining rooms.
A scope conversation and site visit establish existing conditions, layout and budget. The written proposal sets selections, schedule and payment terms. Demolition, licensed rough trades and inspections precede cabinets, counters, tile, fixture trim-out and the punch list, with progress updates along the way.
Based in Pitman. Check your town’s coverage before planning a visit.
It depends on scope, lead times for cabinetry and counters, and whether walls or plumbing move. CMD will give you a written schedule with the proposal rather than a generic promise, and will tell you up front how long you should expect to be without a working kitchen.
Usually yes when plumbing, electrical or structural work changes. Like-for-like cabinet, counter and flooring replacement is often exempt. Your municipal construction office makes the final call, and CMD does not start permit-required work before permits are issued.
Often, yes. Keeping the sink, range and refrigerator where they are avoids most plumbing and electrical relocation. CMD will tell you honestly whether the existing layout is worth keeping.
Licensed New Jersey trade contractors. CMD coordinates their work and the inspections so you have one point of contact.
Share the scope, your budget range and timing.